Infrastructure

Infrastructure

Quality Assurance


Assurance Activities

  • Procedure System are documented as per ISO 9001:2015
  • Periodical calibration of instruments, maintenance of records, review & corrective, preventive actions
  • Shop approvals of sub-contractors, approval procedures for vendors & training

Control Activities

  • Inspection of raw materials, semi-finished / finished components
  • Stage wise inspection at various levels viz. material handling, stores, machining & assembly
  • Final product inspection, testing & dispatch

Product Testing

  • Chemical and mechanical testing of metal batch wise IGC & PMI (On request)
  • Dimensional Checking
  • 100% Hydrostatic / Pneumatic seat and shell for valve before dispatch.
  • Vacuum test (On request) Overall operational & trque
  • Helium Gas Test (On request)

Standards

  • ASTM A 479 (for SS Bar Stock)
  • ASTM A 182 (for SS forgings)
  • NACE-MR-01-75 (Nace Certification)

Master List of Machinery


Machine Type Machine Code Capacity Machine Make
Vertical Machining Centre VMC-1 400mm*300mm ACE
Vertical Machining Centre VMC-2 300mm*200mm ACE
CNC Turning Centre CNC-1 200mm ACE
CNC Turning Centre CNC-2 200mm PMT
CNC Turning Centre CNC-3 200mm ACE
CNC Turning Centre CNC-4 250mm LOKESH
CNC Turning Centre CNC-5 200mm PMT
CNC Turning Centre CNC-6 200mm ACE
CNC Turning Centre CNC-7 200mm PMT
CNC Turning Centre CNC-8 200mm ACE
Lathe Machine L-1 4.1/2FT MMT
Lathe Machine L-2 4.1/2FT Radhika
Capstan Machine CP-1 32mm Tools Today
Traub Machine Tr-1 25mm PMT
Traub Machine Tr-2 32mm SGS
Automatic Bandsaw Machine B-1 200mm Laxson
Milling Machine M-1 01 Gajjar Machine Tools
Drill Machine D-1 ¾3/4” K. M. Panchal
Drill Machine D-2 ¾3/4” K. M. Panchal
Drill Machine D-3 1/2” K. M. Panchal
Tap Machine T-1 M8 Tapax Gujarat
Tap Machine T-2 M8 Tapax Gujarat
Bench Grinder BG-1 - Raj Laxmi
Hand Fly Press HP-1 - Sky Press & Metal
Compressor C-1 - K. E. T. Engg.
Hydro Pneumatic Testing Machine Ts-1 15000psi Mercury Pneumatics
Compressor C-2 14000kg/cm Ankit